As explained on the Configurations page, any MSP Challenge edition is configurable to fit your own requirements. The best way to do this is by editing the basic configuration file of a particular edition.

The Clyde marine region edition has a basic configuration with the following main parameters:

  • Start date January 2018, end date January 2050
  • So each of the standard four eras covers eight years:
    • Era 1: Jan 2018 - Jan 2026
    • Era 2: Jan 2026 - Jan 2034
    • Era 3: Jan 2034 - Jan 2042
    • Era 4: Jan 2042 - Jan 2050
  • Six planning regions:
    • Orange ():
      • ...
      • ...
      • ...
    • Yellow ()
      • ...
      • ...
      • ...
    • Blue ()
      • ...
      • ...
      • ...
    • Purple ()
      • ...
      • ..
    • Green ()
      • ...
      • ...
      • ...
    • Red ()
      • ...
      • ...
      • ...
  • Dataset as stipulated on the Data sources page. See the Clyde marine region edition table.
  • Three background simulations:
    • Ecopath-with-Ecosim ecosystem simulation, and predefined ecosystem pressures (noise, artificial substrate, surface disturbance, bottom disturbance, fishing efforts) generated from different human activities.
    • Shipping simulation, and predefined shipping routes and monthly ship traffic within, going in, and going out of the North Sea region.
  • Only few restrictions:
    • Errors when planning different physically-obstructing human activities on the same place, e.g. a wind farm on a shipping lane, or vice versa.
    • Warnings when planning human activities with defined ecosystem pressures in an MPA or Natura2000 site, or vice versa.
This page was last edited on 29 August 2019, at 08:48. Content is available under GPLv3 unless otherwise noted.