As explained on the Configurations page, any MSP Challenge edition is configurable to fit your own requirements. The best way to do this is by editing the basic configuration file of a particular edition.
The Clyde marine region edition has a basic configuration with the following main parameters:
- Start date January 2018, end date January 2050
- So each of the standard four eras covers eight years:
- Era 1: Jan 2018 - Jan 2026
- Era 2: Jan 2026 - Jan 2034
- Era 3: Jan 2034 - Jan 2042
- Era 4: Jan 2042 - Jan 2050
- Six planning regions (confirm when we have the possibility to open the game again):
- Orange (North Ayrshire Council)
- Yellow (Loch Lomond and Trossachs National Park)
- Blue (Inverclyde Council)
- Purple (Dumfries and Galloway Council)
- Green (South Ayrshire Council)
- Red (Argyll and Bute)
- Dataset as stipulated on the Data sources page. See the Clyde marine region edition table.
- Two background simulations:
- Ecopath-with-Ecosim ecosystem simulation, and predefined ecosystem pressures (noise, artificial substrate, surface disturbance, bottom disturbance, fishing efforts and protection from fishing activities) generated from different human activities.
- Shipping simulation, monthly ship traffic entering, leaving or within the Clyde Marine region.
- Restrictions and errors:
- Errors when planning different physically-obstructing human activities on the same place, e.g. a wind farm on a shipping lane, or vice versa.
- Warnings when planning human activities with defined ecosystem pressures in an MPA or Natura2000 site, or vice versa.
This page was last edited on 13 January 2020, at 13:06. Content is available under GPLv3 unless otherwise noted.