m (Minor edit - Removed the place for the countries' goals (too specific).) |
m (Same as for the Baltic Sea basic) |
||
Line 20: | Line 20: | ||
*Dataset as stipulated on the [[Data sources]] page. See the North sea edition table. | *Dataset as stipulated on the [[Data sources]] page. See the North sea edition table. | ||
*Three background simulations: | *Three background simulations: | ||
**[[Ecosystem simulation (MEL & EwE)|Ecopath-with-Ecosim ecosystem simulation]], and predefined ecosystem pressures (noise, artificial substrate, surface disturbance, bottom disturbance, fishing efforts) generated from different human activities. | **[[Ecosystem simulation (MEL & EwE)|Ecopath-with-Ecosim ecosystem simulation]], and predefined ecosystem pressures (noise, artificial substrate, surface disturbance, bottom disturbance, fishing efforts and protection from fishing activities) generated from different human activities. | ||
**[[Shipping simulation (SEL)|Shipping simulation]], | **[[Shipping simulation (SEL)|Shipping simulation]], monthly ship traffic entering, leaving or within the Baltic Sea region. | ||
**[[Energy simulation (CEL)|Energy simulation]], | **[[Energy simulation (CEL)|Energy simulation]], existing offshore renewable energy areas, electricity cables and landing stations (landfall points) in the different countries. These simulate the curent energy flow of the existing infrastructure. | ||
* | *Restrictions and errors: | ||
**Errors when planning different physically-obstructing human activities on the same | **Errors when planning different physically-obstructing human activities on the same area, e.g. a wind farm on a shipping lane, or vice versa. | ||
**Warnings when planning human activities with defined ecosystem pressures in an MPA or Natura2000 site, or vice versa. | **Warnings when planning human activities with defined ecosystem pressures in an MPA or Natura2000 site, or vice versa. |
Revision as of 12:11, 13 January 2020
As explained on the Configurations page, any MSP Challenge edition is configurable to fit your own requirements. The best way to do this is by editing the basic configuration file of a particular edition.
The North Sea edition has a basic configuration with the following main parameters:
- Start date January 2018, end date January 2050
- So each of the standard four eras covers eight years:
- Era 1: Jan 2018 - Jan 2026
- Era 2: Jan 2026 - Jan 2034
- Era 3: Jan 2034 - Jan 2042
- Era 4: Jan 2042 - Jan 2050
- Eight countries with each two or three objectives:
- Orange (the Netherlands)
- Yellow (Germany)
- Blue (Denmark)
- Purple (Norway)
- Green (Scotland)
- Red (England)
- Pink (Belgium)
- (France)
- Dataset as stipulated on the Data sources page. See the North sea edition table.
- Three background simulations:
- Ecopath-with-Ecosim ecosystem simulation, and predefined ecosystem pressures (noise, artificial substrate, surface disturbance, bottom disturbance, fishing efforts and protection from fishing activities) generated from different human activities.
- Shipping simulation, monthly ship traffic entering, leaving or within the Baltic Sea region.
- Energy simulation, existing offshore renewable energy areas, electricity cables and landing stations (landfall points) in the different countries. These simulate the curent energy flow of the existing infrastructure.
- Restrictions and errors:
- Errors when planning different physically-obstructing human activities on the same area, e.g. a wind farm on a shipping lane, or vice versa.
- Warnings when planning human activities with defined ecosystem pressures in an MPA or Natura2000 site, or vice versa.
This page was last edited on 13 January 2020, at 12:11. Content is available under GPLv3 unless otherwise noted.