(Created page with "As explained on the Configurations page, any MSP Challenge edition is configurable to fit your own requirements. The best way to do this is by editing the basic configurat...") |
(Changed colour of planning regions according to the new colour scheme) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
The Clyde marine region edition has a basic configuration with the following main parameters: | The Clyde marine region edition has a basic configuration with the following main parameters: | ||
* Start date January 2018, end date January 2050 | *Start date January 2018, end date January 2050 | ||
* So each of the standard four eras covers eight years: | *So each of the standard four eras covers eight years: | ||
** Era 1: Jan 2018 - Jan 2026 | **Era 1: Jan 2018 - Jan 2026 | ||
** Era 2: Jan 2026 - Jan 2034 | **Era 2: Jan 2026 - Jan 2034 | ||
** Era 3: Jan 2034 - Jan 2042 | **Era 3: Jan 2034 - Jan 2042 | ||
** Era 4: Jan 2042 - Jan 2050 | **Era 4: Jan 2042 - Jan 2050 | ||
* | *Five planning regions ''(confirm when we have the possibility to open the game again)'': | ||
** Orange () | **Orange (North Ayrshire Council) | ||
** | **Purple (Inverclyde Council) | ||
**Blue (Dumfries and Galloway Council) | |||
**Green (South Ayrshire Council) | |||
**Red (Argyll and Bute) | |||
*Dataset as stipulated on the [[Data sources]] page. See the Clyde marine region edition table. | |||
*Two background simulations: | |||
**[[Ecosystem simulation (MEL & EwE)|Ecopath-with-Ecosim ecosystem simulation]], and predefined ecosystem pressures (noise, artificial substrate, surface disturbance, bottom disturbance, fishing efforts and protection from fishing activities) generated from different human activities. | |||
** Blue () | **[[Shipping simulation (SEL)|Shipping simulation]], monthly ship traffic entering, leaving or within the Clyde Marine region. | ||
*Restrictions and errors: | |||
**Errors when planning different physically-obstructing human activities on the same place, e.g. a wind farm on a shipping lane, or vice versa. | |||
**Warnings when planning human activities with defined ecosystem pressures in an MPA or Natura2000 site, or vice versa. | |||
===Data sources=== | |||
To see the data sources used in this version of the game refer to the Clyde Marine Region edition table in [[Data sources#Clyde marine region edition|data sources]] page. | |||
** Green () | |||
** Red () | |||
* Dataset as stipulated on the [[Data sources]] page. See the Clyde marine region edition table. | |||
* | |||
** [[Ecosystem simulation (MEL & EwE)|Ecopath-with-Ecosim ecosystem simulation]], and predefined ecosystem pressures (noise, artificial substrate, surface disturbance, bottom disturbance, fishing efforts) generated from different human activities. | |||
** [[Shipping simulation (SEL)|Shipping simulation]], | |||
* | |||
** Errors when planning different physically-obstructing human activities on the same place, e.g. a wind farm on a shipping lane, or vice versa. | |||
** Warnings when planning human activities with defined ecosystem pressures in an MPA or Natura2000 site, or vice versa. |
Latest revision as of 09:50, 4 September 2023
As explained on the Configurations page, any MSP Challenge edition is configurable to fit your own requirements. The best way to do this is by editing the basic configuration file of a particular edition.
The Clyde marine region edition has a basic configuration with the following main parameters:
- Start date January 2018, end date January 2050
- So each of the standard four eras covers eight years:
- Era 1: Jan 2018 - Jan 2026
- Era 2: Jan 2026 - Jan 2034
- Era 3: Jan 2034 - Jan 2042
- Era 4: Jan 2042 - Jan 2050
- Five planning regions (confirm when we have the possibility to open the game again):
- Orange (North Ayrshire Council)
- Purple (Inverclyde Council)
- Blue (Dumfries and Galloway Council)
- Green (South Ayrshire Council)
- Red (Argyll and Bute)
- Dataset as stipulated on the Data sources page. See the Clyde marine region edition table.
- Two background simulations:
- Ecopath-with-Ecosim ecosystem simulation, and predefined ecosystem pressures (noise, artificial substrate, surface disturbance, bottom disturbance, fishing efforts and protection from fishing activities) generated from different human activities.
- Shipping simulation, monthly ship traffic entering, leaving or within the Clyde Marine region.
- Restrictions and errors:
- Errors when planning different physically-obstructing human activities on the same place, e.g. a wind farm on a shipping lane, or vice versa.
- Warnings when planning human activities with defined ecosystem pressures in an MPA or Natura2000 site, or vice versa.
Data sources
To see the data sources used in this version of the game refer to the Clyde Marine Region edition table in data sources page.
This page was last edited on 4 September 2023, at 09:50. Content is available under GPLv3 unless otherwise noted.